NDM Construction Inc NDM ConstructionGeneral Contractor · San Jose Call Now · (408) 608-9319
Custom ADU Construction in San Jose

Family-owned · San Jose Local

Custom ADU Construction in San Jose

Detached, attached, and garage conversion ADUs built to San Jose code by a licensed CA general contractor.

4.9 · 10 reviews

Request an estimate

Tell us what you need

No obligation · Responds within 1 business day

By submitting this form you agree that we may contact you about your request and share your name and email address with partner companies for email marketing. We never share your mobile number or text message consent with third parties or affiliates for marketing or promotional purposes.

Overview

ADU Construction Options for San Jose Properties

Talk it through(408) 608-9319

Custom ADU construction in San Jose is one of the more complex residential projects a licensed general contractor takes on, and NDM Construction Inc handles the full scope: detached units, attached additions, and garage conversions, from permit coordination through final inspection. If you're trying to add rental income, house extended family, or simply maximize what your lot can do in one of the most expensive housing markets in the country, an ADU is worth the process. Call (408) 608-9319 to talk through your property and get a realistic picture of what's involved.

  1. What drives ADU cost in San Jose isn't the square footage alone. Lot configuration, existing foundation conditions, utility connection distances, Title 24 energy compliance requirements, soil reports (sometimes triggered by hillside lots in Almaden Valley or Saratoga-adjacent zones), and finish level all move the number in different directions. A straightforward garage conversion on a flat East San Jose lot looks nothing like a detached two-story unit in Willow Glen with custom millwork and a separate meter. Both are ADUs. Both cost very different amounts. Every job is different, so contact NDM Construction Inc for an accurate estimate on your specific property.

ADU TYPES

Detached, Attached, or Garage Conversion Garage Conversion

The right ADU type depends on your lot, zoning, and how much you want to spend.

Detached ADU

A standalone structure separate from the main house. Maximum privacy for a rental or in-law suite. Requires its own foundation, utility connections, and setback clearances. In San Jose, minimum setbacks are typically 4 feet from side and rear property lines for detached ADUs under 800 sq ft, though some older neighborhoods carry different rules. Best for lots with enough rear yard depth to absorb those setbacks without cramping either structure.

Attached ADU

Built as an addition to the existing home, sharing at least one wall. Generally less expensive than a detached unit because it can tie into existing utility runs more directly. The design challenge is creating a genuinely separate living space with sound separation, a private entrance, and its own HVAC zone. We've done this work alongside bathroom remodeling and interior renovations where the main house is getting updated at the same time.

Garage Conversion

Converting an existing attached or detached garage into livable space. San Jose's ADU ordinance is relatively friendly to these, and they're often the fastest path because the structure already exists. The trade-off: you lose the garage for vehicle storage, which affects resale math in some neighborhoods. Structural upgrades, insulation, egress windows, and a proper subfloor are required, not optional. Our garage epoxy floor coating work is a separate service, but full garage conversion is a different scope entirely.

Junior ADU (JADU)

A smaller unit up to 500 sq ft created within the existing footprint of the primary home, often from a bedroom or interior space. JADUs require a shared entrance or an interior connection to the main residence. Simpler permit path in most cases, lower cost, but also limited in size and layout flexibility. A good option when the lot doesn't support a full ADU or the budget doesn't.

San Jose Permitting: What Actually Happens

The permitting phase is where most ADU timelines slip, and it's rarely the builder's fault.

  1. 01

    Pre-Application Research

    Before a single drawing gets submitted, we pull your parcel data, confirm zoning, check for recorded easements, and identify any neighborhood-specific overlay restrictions. Willow Glen, Almaden Valley, and Silver Creek each have quirks. Skipping this step costs weeks later.

  2. 02

    Design and Plan Preparation

    San Jose accepts both custom-drawn plans and the state's pre-approved ADU plan library. Pre-approved plans can speed approval in straightforward cases. For custom layouts, we work with licensed architects and engineers on your behalf. Whether you need a separate architect depends on the complexity of the project, not just preference.

  3. 03

    Permit Submission and Review

    San Jose's Building Division has implemented online permit submission, which helps. But plan check can take 4 to 10 weeks depending on current volume, and correction cycles add time if comments come back. We can't guarantee a review timeline, and any contractor who does is guessing. What we do is submit clean plans the first time to reduce correction rounds.

  4. 04

    Construction and Inspections

    Once permits are issued, construction proceeds in phases tied to required inspections: foundation, framing, rough mechanical and electrical, insulation, Title 24 verification, and final. Each inspection has to clear before the next phase starts. We schedule inspections as early as slots allow and don't let a project sit idle waiting on paperwork we can control.

WHAT TO KNOW

San Jose ADU Rules That Catch Homeowners Off Guard

  1. 01

    Title 24 Energy Compliance

    Every new ADU in California has to meet Title 24 energy efficiency standards. This isn't optional and it's not just insulation. It covers windows, lighting, HVAC efficiency, and sometimes solar readiness depending on size. A compliant energy calculation has to be submitted with your plans.

  2. 02

    Owner-Occupancy Rules

    California suspended the owner-occupancy requirement for ADUs through 2025, meaning you don't have to live on the property to rent an ADU. That rule could change. Don't build your long-term rental strategy around a temporary exemption without confirming current law.

  3. 03

    Utility Connections and Fees

    San Jose waived impact fees for ADUs under 750 sq ft, which is significant. But utility connection fees from San Jose Water or San Jose Clean Energy are separate and can run thousands of dollars depending on meter sizing and service location. Budget for them.

Our Process

NDM's Approach to ADU Projects

We're a licensed California general contractor with 4.9 stars across 10 Google reviews. The work we do on residential remodeling projects carries into every ADU build.

  1. Step 01

    Site Assessment and Honest Scoping

    We walk the property, pull the parcel data, and tell you what's realistic before you commit to anything. If your lot has a problem that will triple the cost, you'll know at the start.

  2. Step 02

    Permit Coordination Through Approval

    We handle submission to San Jose's Building Division, respond to plan check comments, and track the permit through to issuance. We won't disappear during the waiting period.

  3. Step 03

    Construction With Your Schedule in Mind

    We build to inspection schedule, not to the calendar. If you're living on the property during construction, we'll tell you what phases are disruptive and plan around them where possible.

Straight from Google

What Real Clients Say About NDM's Work actually check

4.910 verified Google reviews
★★★★★
Great work ethic, and quality work! They do their best to accomplish your vision👍
Ed JuradoJul 2026 · Google
★★★★
They’ve done great work at my daughter’s place. Got a recommendation from our friend and we’re happy to have David and Wilbur doing the work. Tile work in the master bathroom was excellent…As a matter of fact we’re asking David to quote on fixing up our rentals next…
chris laOct 2026 · Google
★★★★★
Excellent job done. They were transparent about the process and were always willing to answer any questions I had.
Maria Del Carmen EspinozaOct 2026 · Google
★★★★★
Had a lot of construction work done by Dave , new tiles, bathroom, interior and exterior paint, etc. Ive always called them back for new work… they finish on time and the quality of work is pretty good.
Simran KaurJul 2026 · Google
★★★★★
I had an excellent experience working with David and Wilber from NDM Construction Company on my home renovation project. They completely remodeled my bathrooms and finished my garage, and the results exceeded my expectations. From the initial consultation through project completion, the team was professional, reliable, and highly skilled. They paid close attention to detail, communicated clearly throughout the process, and kept the work area clean and organized. The bathroom remodel turned out beautifully, with high-quality craftsmanship and a modern, polished finish. My garage transformation was equally impressive, creating a functional and attractive space that adds significant value to my home. What stood out most was their commitment to quality and customer satisfaction. They completed the project on schedule, addressed any questions promptly, and ensured everything was done right. I highly recommend NDM Construction Company to anyone looking for trustworthy contractors who deliver exceptional results. I would gladly work with them again on future home improvement projects.
Steven NguyenJun 2026 · Google
Read all 10 reviews

QUICK REFERENCE

San Jose ADU Facts Worth Knowing Before You Call

  1. 01

    ADU size limit in San Jose

    Detached ADUs can be up to 1,200 sq ft. Attached ADUs are limited to 50% of the primary home's living area or 1,200 sq ft, whichever is less. JADUs are capped at 500 sq ft.

  2. 02

    Setback minimums for detached units

    4 feet from side and rear property lines for most detached ADUs. Front setback rules match the primary residence. Flaglot configurations and corner lots each have separate calculations.

  3. 03

    Permitting timeline reality

    Plan check in San Jose currently runs 4 to 10 weeks for first review, with additional time if corrections are issued. Total permit-to-approval can run 3 to 6 months. Construction time is separate.

  4. 04

    Impact fee waiver threshold

    ADUs 750 sq ft and under are exempt from San Jose's development impact fees. ADUs above that threshold may be subject to fees that vary by location and utility zone.

Service area

Service Area for Custom ADU Work

NDM Construction Inc builds ADUs throughout San Jose and the broader Silicon Valley area. We're familiar with permit offices, neighborhood overlays, and lot conditions across the region.

Communities served
14
Reach from San Jose
21 mi
Town not listed?Call (408) 608-9319
Map of 14 communities served around San Jose5 miWillow GlenAlmaden ValleySilver CreekEvergreenMountain ViewSan JoseN5 mi37.28° N · 121.82° W
Straight-line distance from our San Jose base. Hover a town to find it.
  1. San JoseBase
  2. Silver Creek3 mi
  3. Evergreen4 mi
  4. Willow Glen4 mi
  5. Almaden Valley5 mi
  6. Campbell7 mi
  7. Los Gatos8 mi
  8. Santa Clara9 mi
  9. Milpitas11 mi
  10. Saratoga11 mi
  11. Cupertino12 mi
  12. Sunnyvale13 mi
  13. Mountain View16 mi
  14. Palo Alto21 mi

Start Your ADU Project With a Real Conversation

ADU projects in San Jose are complex. Get straight answers from a licensed contractor who's worked this market.

Good to know

Frequently asked questions

Still have a question?

Call and talk it through. You'll get a straight answer from the person doing the work.

(408) 608-9319
How long does ADU permitting actually take in San Jose?
Plan check for a San Jose ADU currently runs 4 to 10 weeks for the first review cycle. If the city issues correction comments, you'll need to revise and resubmit, which adds more time. From permit submission to permit issuance, budget 3 to 6 months in most cases. Construction time starts after permits are in hand. We submit complete, compliant drawings to minimize correction rounds, but we can't control the city's review queue.
What's the difference between a detached ADU and a garage conversion for a San Jose property?
A detached ADU is a new standalone structure built in your rear yard. A garage conversion repurposes an existing structure, which means no new foundation and a simpler permit path in most cases. Garage conversions are typically faster and less expensive, but you lose vehicle storage. Detached units give you more layout flexibility and don't affect your existing garage, but they require more site work, utility runs, and typically take longer to permit and build.
Do I need a separate architect and engineer for my San Jose ADU, or does the contractor handle that?
It depends on the project. San Jose accepts the state's pre-approved ADU plan library for standard unit configurations, which can skip the full architectural drawing process. For custom layouts, hillside lots, or unusual structural conditions, you'll need licensed architectural and engineering drawings. NDM coordinates with licensed architects and structural engineers on projects that need them. We're not architects, and we won't tell you that you don't need one when you do.
What are the setback requirements for a detached ADU in San Jose?
Most detached ADUs in San Jose require a minimum 4-foot setback from side and rear property lines. Front setbacks match the primary residence's setback requirements. Corner lots, flaglots, and properties with recorded easements have different calculations. Some neighborhoods with older subdivision maps have additional restrictions layered on top of current code. We pull your parcel data before drawing anything so you're not designing to dimensions your lot can't support.
Are there neighborhoods in San Jose where ADU construction is more restricted?
State law limits what local jurisdictions can restrict, so outright bans aren't legal in California anymore. But neighborhoods with historic overlays, properties in flood zones, lots with HOA CC&Rs (which are private rules, not city rules), and parcels with recorded deed restrictions can all face constraints the city's standard ADU rules don't capture. Willow Glen, parts of Almaden Valley, and some older established neighborhoods are worth checking before you commit to a design. We identify these issues during the pre-application phase.
What does Title 24 compliance mean for my ADU construction in California?
Title 24 is California's energy code, and every new ADU has to meet it. In practice, this means your plans need to include an energy compliance report showing that the unit's insulation, windows, lighting, and mechanical systems hit the required efficiency levels. Some ADUs above a certain size trigger solar readiness requirements. An energy compliance report is submitted with your permit application. We factor Title 24 requirements into the design process from the start rather than retrofitting compliance after the plans are drawn.

Related

Next step

Tell us about the job

Your name, your number and what needs doing. A person from NDM Construction Inc gets back to you.

Rather talk now?(408) 608-9319

No obligation · Responds within 1 business day


By submitting this form you agree that we may contact you about your request and share your name and email address with partner companies for email marketing. We never share your mobile number or text message consent with third parties or affiliates for marketing or promotional purposes.